President
PACE Advanced Water Engineering
Fountain Valley, CA
Mark Krebs has engineering and construction experience specific to water resources spanning back to 1988. He has a highly specialized background in water feature engineering, including small and large-scale manmade lakes, formal fountains, streams, waterfalls, recreational pools, and water play areas. His design expertise includes designing manmade lakes to serve as functional stormwater management systems, including conveyance, detention, sediment management, water quality treatment, and recharge. He also has highly specialized stormwater management expertise, including floodplain analysis and mapping, watershed modeling / hydrology analysis, regional flood control facility plans, river engineering, urban storm drain systems, stormwater quality, and hydraulic structures.
Disclosure information not submitted.
THUR-FS-01: Healing Land, Water, and Community — Earvin Magic Johnson Park
Thursday, September 17, 2026
12:30 PM - 4:30 PM PT